title: "Guidelines & Recommendations After a Helical Pile Installation"
id: "37605"
type: "post"
slug: "guidelines-recommendations-after-a-helical-pile-installation"
published_at: "2025-03-11T19:08:45+00:00"
modified_at: "2025-10-29T18:31:23+00:00"
url: "https://www.technometalpost.com/en-GB/guidelines-recommendations-after-a-helical-pile-installation/"
markdown_url: "https://www.technometalpost.com/en-GB/guidelines-recommendations-after-a-helical-pile-installation.md"
excerpt: "We’d like to touch base on some important points to follow after a helical pile installation. Proper care is essential to ensure the longevity of any structure, whether you're building a deck, modular home, shed, or any other type of..."
taxonomy_category:
  - "Articles"
---

March 11, 2025

# Guidelines & Recommendations After a Helical Pile Installation

![Image](https://www.technometalpost.com/wp-content/uploads/DSCF0527-1.jpg)

We’d like to touch base on some important points to follow after a helical pile installation. Proper care is essential to ensure the longevity of any structure, whether you're building a deck, modular home, shed, or any other type of structure. To help you avoid common issues, we’ve listed key guidelines and recommendations to follow.

 Here’s what you need to know:

  **Construction & Maintenance Phase**

 It’s imperative to maintain a **minimum** clearance of 6 inches between the ground and all structures, keeping in mind that the top plate bracket should never be buried. This provides proper spacing between building elements and the ground, while also allowing for ground expansion during different weather conditions.  
 Ex: frozen ground and/or soil moisture

 **Note**:

- A minimum clearance of 6 inches between the ground and all construction features, such as skirting, beams, joists, or columns, is also necessary.
- Once the structure is in place, refrain from backfilling the area and burying the piles and space with objects, pavers, earth, or other materials. The 6” clearance **must** be maintained at all times.

 [https://www.technometalpost.com/wp-content/uploads/Bonnes-Pratiques-1-Construction-LOW.mp4](https://www.technometalpost.com/wp-content/uploads/Bonnes-Pratiques-1-Construction-LOW.mp4)

   **Staircase Installation**

 If a staircase is connected to your structure, we also highly recommend installing TMP’s helical piles under the last step, again keeping a minimum clearance of 6 inches (to the ground) to ensure proper stability and support. If that option isn’t feasible, consider using a hinge system directly on the staircase to provide a mobile joint. Either of these methods will accommodate potential movement and prevent any shifting or uneven settling.

 [https://www.technometalpost.com/wp-content/uploads/TMP-Bonnes-Pratiques-2-Escalier-LOW-2.mp4](https://www.technometalpost.com/wp-content/uploads/TMP-Bonnes-Pratiques-2-Escalier-LOW-2.mp4)

  **Storage**

 When storing items underneath your structure, it’s also important to reserve a **minimum** of 6 inches of space between your stored items and the structure itself. The reason is, that in regions where you have freeze/thaw cycles or swelling clay, ground movement can potentially push the objects upwards against the structure. Important to note: the piles themselves won’t be displaced, but the structure itself might be affected if the space distance isn’t respected.

 [https://www.technometalpost.com/wp-content/uploads/TMP-Bonnes-Pratiques-3-Entreposage-LOW.mp4](https://www.technometalpost.com/wp-content/uploads/TMP-Bonnes-Pratiques-3-Entreposage-LOW.mp4)

  The most important takeaway from this article is your attention to detail and taking the precautionary steps from the guidelines above. These key suggestions will contribute to the longevity of your project, avoid common issues, and provide adequate storage space without causing overall damage.

Share

[Facebook](https://www.facebook.com/sharer/sharer.php?u=https%3A%2F%2Fwww.technometalpost.com%2Fen-GB%2Fguidelines-recommendations-after-a-helical-pile-installation%2F)
[Linkedin](https://www.linkedin.com/shareArticle?mini=true&url=https%3A%2F%2Fwww.technometalpost.com%2Fen-GB%2Fguidelines-recommendations-after-a-helical-pile-installation%2F&title=Guidelines%20&%20Recommendations%20After%20a%20Helical%20Pile%20Installation&summary=Check%20out%20this%20post%20-&source=Techno%20Pieux)

## You will also like

[We Have a New Dealership in Oregon, USA: Introducing Techno Metal Post Columbia RiverWe are pleased to welcome Nick, Steve and Brent, the team behind Techno Metal Post Columbia River in Oregon.](https://www.technometalpost.com/en-GB/we-have-a-new-dealership-in-oregon-usa-introducing-techno-metal-post-columbia-river/)

[Helical Piles for Your Solar Panels: A Suitable and Durable FoundationTechno Metal Post helical piles are particularly well suited to photovoltaic structures. Their design helps meet the requirements related to the weight of the equipment, wind and snow loads, as well as ground conditions.](https://www.technometalpost.com/en-GB/helical-piles-for-your-solar-panels-a-suitable-and-durable-foundation/)

[Welcome to Techno Metal Post 3 Lacs, SwitzerlandWe’re pleased to introduce Vincent Jenny, a professional who will be leading Techno Metal Post 3 Lacs in Switzerland.](https://www.technometalpost.com/en-GB/welcome-to-techno-metal-post-3-lacs-switzerland/)

SCREW PILES

WITH TECHNO METAL POST, IT'S SIMPLE & QUICKTechno Metal Post designs and manufactures screw piles, specialized installation equipment and all the elements required to support your permanent and temporary projects.

 We simplify your life by providing an alternative foundation solution that can be installed in most soil conditions.

[Request a quote](https://www.technometalpost.com/en-GB/find-your-dealer/)