Type of Project
The installation of 11x P3 and 15 x P2.5 piles for a steel-frame house with an integrated container and deck feature.
Location
Martigny, Switzerland.
Challenges
Sloping terrain with substantial backfill requiring extra precautions and adapted machinery to ensure stability and safety.
- Ensuring a precise helical pile installation for a custom-built structure.
- Adaptation to the challenges of a sloping terrain.
- Coordination and schedule management for a quick installation following delivery.
Solution
The installation of 11x P3 and 15 x P2.5 piles. After the helical pile foundation was screwed in, the steel structure was immediately installed using a crane.
Results / Conclusion
Thanks to our technology, no curing time is required, which allows for a quick installation after the piles have been screwed in.
- Demonstrated our skills and management for complex projects.
- Ensured a quick and on-time structure installation.
- Validated the reliability and durability of our helical pile foundations, even under challenging conditions.
Additional Information
Dealer: Techno Metal Post Valais Genève