Contact an installer
Your dealer
Techno Metal Post Northeast Pennsylvania LLC
114 Saw Mill Rd, Greentown, PA, 18426
More info
Full project address
01
Most popular
02
Categories
01
Professionals

What is the installation time?

To install a pile at a depth of 6 feet, it takes about 30 minutes per pile.

Back to the FAQ

Other options for getting help

HELICAL FOUNDATIONS

WITH TECHNO METAL POST, IT'S FAST AND EASY

Techno Metal Post makes life easier for anyone with a construction project that requires a foundation in almost any type of soil.

Contact an installer
crossmenuarrow-leftarrow-right