Type of Project
Installation of 250 P4 piles for the foundations of a modular project.
Location
Lewes, southeast England, in a residential area near existing homes (BN7)
Challenges
With the site located near residential areas, Techno Metal Post focused on reducing noise and vibration to minimize disturbance to nearby residents.
Solutions
The installation spanned over four visits between February and October 2024 to accommodate the client's program management.
Results / Conclusion
The precision in pile installation and the ability to accommodate the client’s program management resulted in cost savings for the clients.
- Minimized calibration: Techno Metal Post provided a high-precision installation, minimizing the need for calibration to ensure perfect levelling prior to the modular unit's installation.
- Rapid Execution: Over 100 foundations were installed in just 3 days, demonstrating our team's efficiency and capabilities.
- Reduced Environmental Impact: Minimal environmental footprint and effective noise management preserved the residents' comfort.
- Flexibility and Coordination: The project progressed smoothly despite logistical and weather challenges, thanks to our compact equipment and effective coordination with other contractors.
- Compact Equipment and Agility: Techno Metal Post's installation speed and agile operations facilitated cooperation with other service providers and enabled continuous construction.
- During one particular visit, Techno Metal Post installed over 100 piles within 3 days, with 3 teams working simultaneously to ensure rapid progress.
Additional Information
Dealer: Techno Metal Post UK