Contact an installer
Full project address
01
Most popular
02
Categories
01
Professionals

Do you do the pile layout?

It is the responsibility of the structure designer (builder, contractor, architect, etc.) to lay out the piles before the installation team arrives. We can propose a pile layout, but it must be validated by the structure designer. However, for simple and light structures (normal terrace, extension, etc.), we can make the location of the piles that you will have to approve.

Back to the FAQ

Other options for getting help

HELICAL PIER FOUNDATIONS

WITH TECHNO METAL POST, IT'S SIMPLE & QUICK

Techno Metal Post simplifies life by providing an alternative foundation solution that can be installed in most soil conditions.

Contact an installer
crossmenuarrow-leftarrow-right