The installation of 11x P3 and 15 x P2.5 piles for a steel-frame house with an integrated container and deck feature.
Martigny, Switzerland.
Sloping terrain with substantial backfill requiring extra precautions and adapted machinery to ensure stability and safety.
The installation of 11x P3 and 15 x P2.5 piles. After the helical pile foundation was screwed in, the steel structure was immediately installed using a crane.
Thanks to our technology, no curing time is required, which allows for a quick installation after the piles have been screwed in.