Timber-Frame Addition. This project required constructing a timber-frame addition on a site with very soft soil and a steep slope. Techno Metal Post quickly installed a pile foundation ensuring a stable and durable solution despite the difficult site conditions.
Argos Hill, Sussex, England (BN9)
Despite the site’s challenges, the project was successfully completed in just 2 days. This rapid turnaround was made possible by Techno Metal Post’s expertise, precision-engineered helical piles, and cutting-edge installation equipment. Our specialized machinery ensures an accurate and efficient installation, guaranteeing a stable foundation even on complex terrains, all while fully respecting the job site.
This timber-frame addition demonstrates Techno Metal Post’s innovative foundation solutions within challenging environments. Completing this project within a tight deadline showcases the reliability of our helical piles and the efficiency of our installation equipment, making them ideal for overcoming soft ground and sloping terrain challenges.
Dealer: Techno Metal Post UK
SCREW PILES
WITH TECHNO METAL POST, IT'S SIMPLE & QUICKTechno Metal Post simplifies life by providing an alternative foundation solution that can be installed in most soil conditions.