A Steel Frame House with a Container and Deck Integration in Switzerland

Type of Project 

The installation of 11x P3 and 15 x P2.5 piles for a steel-frame house with an integrated container and deck feature.

Location

Martigny, Switzerland.

Challenges

Sloping terrain with substantial backfill requiring extra precautions and adapted machinery to ensure stability and safety.

  • Ensuring a precise helical pile installation for a custom-built structure.
  • Adaptation to the challenges of a sloping terrain.
  • Coordination and schedule management for a quick installation following delivery.
Solution

The installation of 11x P3 and 15 x P2.5 piles. After the helical pile foundation was screwed in, the steel structure was immediately installed using a crane.

Results / Conclusion

Thanks to our technology, no curing time is required, which allows for a quick installation after the piles have been screwed in.

  • Demonstrated our skills and management for complex projects.
  • Ensured a quick and on-time structure installation.
  • Validated the reliability and durability of our helical pile foundations, even under challenging conditions.
Additional Information

Dealer: Techno Metal Post Valais Genève

Back to case studies

HELICAL PIER FOUNDATIONS

WITH TECHNO METAL POST, IT'S SIMPLE & QUICK

Techno Metal Post simplifies life by providing an alternative foundation solution that can be installed in most soil conditions.

Contact an installer
crossmenuarrow-leftarrow-right